Small Capacity Beverage Filling Machineage Filling Machine
Rinsing Machine
(1). Rinsing Capacity 2000bottles / hour
(2). Fitting Bottle Size 200, 250, 350, 500, 650, 750, 1000 1250 1500ML
(3). Running Method Continuous Gyration Running
(4). Number of Rinsing Position 12 Pieces
(5). Power of the Machine 1.5 kW
(6). Overall Weight of the Machine 700kg
(7). Overall Dimensions 1400× 1200× 1800mm
Filling Machine
This machine is ideal auto-filling device at present
(1). Range of bottle volume 200, 250, 350, 500, 650, 750, 1000ml PET and Glass Bottle
(2). Range of bottle size
A. Diameter of bottle 50-90mm
B. Height of bottle 200-330mm
C. Inner-diameter of bottle ≥ 17mm
Capping Machine
Capacity: 1500-2000bottles / hour
Power of the main motor 1.2Kw
Overall dimension 920X800X1940mm
Total weight: 500Kg
Model |
Production |
Bottle Height |
Motor Power |
ZPC-12 GFP-12 YQX-3 |
1000-2000b/h |
160-300mm |
3.05kw |
ZPC-18 GFP-16 YQX-4 |
2000-4000b/h |
160-320mm |
4.07kw |
ZPC-24 GFP-24 YQX-6 |
3000-8000b/h |
160-340mm |
4.82kw |
YQX-3 automatic capping machine connects with transporter. Bottle is transported to sealing machine by conveyer belt, after sealed, passed by medium stand, transported to capping machine by conveyer belt, automatic cap-dropping equipment drops cap very well to seal cap. After sealing, conveyor belt puts out bottle and bottles are packed in a box
About King Machine
<1> Standardized workshop of total 12,000 square meters.
Different types of processing units, such as water jet cutter, plasma cutter, laser cutter, CNC machine from Taiwan chevalier & korea daewoo, ensure the precision of parts.
<2>International certification, National Certificate of equipment verification, and more than 30 invention patents are done in King machine .
Verification Certificates of equipments: ISO9001:2001; CE Certificate , SGS , COC , TUV
National Certificate of equipment verification:standard organisation of Nigeria , CNCA certificate, Logo trademark registration, etc.
<3>The equipment will be tested and run for 24 hours before leaving the factory, to ensure the smooth working of water pipeline, and pneumatic, electrical and mechnical stability.
<4>Sufficient stock of spare parts ensures the timely delivery and supply of spare parts.
<5>The engineers are experienced. We can produce different products with different capacity and work out reasonable flow chart as per customers' requirements to save space.
<6>Professional installation team who can speak fluent English can help customers make benefits in a shortest time.
King Machine Service
1. Installation, debug
After equipment reached the workshop of customer, place the equipment according to plane layout we offered. We will arrange seasoned technician for equipment installation, debug and test production at the same time make the equipment reach the rated producing capacity of the line. The buyer need to supply the round tickets and accommodation of our engineer, and the salary.
2. Training
Our company offer technology training to customer. The content of training is structure and maintenance of equipment, control and operation of equipment. Seasoned technician will guide and establish training outline. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures.
3. Quality guarantee
We promise that our goods are all new and not used. They're made of suitable material, adopt new design. The quality, specification and function all meet the demand of contract. We promise that the products of this line could storage for one year without adding any aseptic.