Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including

Product Details
Customization: Available
After-sales Service: Support
Warranty: 12 Months

360° Virtual Tour

Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
94
Year of Establishment
2013-01-30
  • Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including
  • Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including
  • Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including
  • Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including
  • Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including
  • Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including
Find Similar Products
  • Overview
  • Product Description
  • Blowing part
  • Washing Filling Capping
  • Auxiliary machines
  • After Sales Service
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
KM
Automatic Grade
Automatic
Material Type
Liquid
Filling Valve Head
Multi-Head
Feed Cylinder Structure
Single-Room Feeding
Dosing Device
Plunger
Filling Principle
Atmospheric Pressure
Packaging Container Lifting Structure
Chute Lifting
Structure
Rotary
Packaging
Bottle
Packaging Material
Plastic
Function
Blowing, Filling, Capping
Used for
Pure / Mineral Water
Material
Stainless Steel
Controlled by
Siemens PLC
Filling Type
Normal Pressure
Capacity
18000bph~60000bph
Bottle Size
250ml~2000ml (Special Can Be Order)
Suitable
Pet Bottle & Screw Cap
Warranty Time
12 Months
Transport Package
Export Standard Packages.
Specification
CGF
Trademark
King Machine
Origin
Zhangjiagang City, China
HS Code
8422
Production Capacity
5 Sets /Month

Product Description

A to Z Pure Water Beverage Drink Blow/ Fill/ Cap Combiblock Filling Machine
Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including
*We supply complete solution for the water filling plant ,including Water treatment system / Washing filling capping machine / Code sprayer / Automatic labeling machine / Automatic packing machine / Automatic Palletizer system

Product Description

 

We have developed a multi-functional blowing filling and capping combination block, through the applicant of optical , mechanical, electrical and pneumatic integration, it adopts servo system for synchronous control, realize the comprehensive control and production of multiple equipment, improve the production efficiency of the entire production line , and reduces the investment cost , energy consumption and maintenance cost. It is suitable for the production of carbonated drink, juice and water , and other products .

Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including
Our combi block machine capacity can reach
for example like water production
0.5l bottle capacity is 12,000bph to 54,000bph
And 4l 5l Capacity is 4000bph to 6000bph
15L 19l Capacity is 1500bph to 3600bph
Our combi block machine single cavity capacity can reach 2000bph to 2500bpb .
Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including

Blowing part

The automatic rotary blow molding machine has five major technical advantages. The quasi-guaranteed blow molding machine can produce a variety of PET bottles that meet customer requirements with high yield and low consumption. Compared with the linear blow molding machine, the sealing and stretching of the rotary blow molding machine are separate and independent, and the clamping force is strong, so the adjustment of the bottle is relatively stable, the bottle strength is more uniform, and the mold clamping line is thinner. Great improvements have been made in frame reinforcement, track optimization, etc. The equipment has less vibration and more stable operation; the heating distance has been reduced again to reach the distance of a certain international brand, and the same heating distance can be reduced by 1/ 4 energy consumption.
Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including

Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including
Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including
Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including

Washing Filling Capping

The machine is mainly used in the water filling operations. The three functions of bottle rinsing, filling and capping are composed in one body of the machine. The whole process is automatic. The machine is used in filling mineral water and purified water in bottles made of polyester and plastics.
Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including

Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including

Washing heads

The rotary disk is fully made of SUS304 stainless steel.
Using imported special efficient spray nozzle, the washing water will be sprayed in a particular angle, can wash any part of the inner wall, rinse with water thoroughly and save flush bottle.
Bottle clamp and lifting mechanism of sliding sleeve adopts Germany Igus corrosion resistant bearing without maintenance.
Washing part moves by a frame in the transmission system through the gear transmission.

Filling heads

The washing bottle, filling, sealing are connecting with the thumbwheel card bottleneck transportation methods.
The rotating disk is all made of SUS304 stainless.
Filling method is fravity filling.
Filling valve manufactured by SUS304.
The filling valve structure design is reasonable, the filling quantity is accurate.

Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including
Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including

Capping heads

The capping machine is the highest precision in 3-in-1 unit machine, on the reliability of equipment operation, has enormous influence on the defective rate of the product.Introduced the world's most advanced Italian AROL capping machine technology, combining with the filling machine production experience improvement, and ask college of Shanghai Jiao Tong university mechanical engineering institute of electrical and mechanical design and automation technology of experts and professors to help design.

 

Auxiliary machines

Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including

RO water treatment system

We adopt different equipment to produce pure water, mineral water etc. The main equipment of RO Water Treatment Plant are silica sand filter, active carbon filter, sodium ion exchanger, hollow fiber, RO( reverse osmosis), UV sterilizer, precision filter, ozone generator, water tank etc. It can effectively get rid of muddy organic matter, iron, manganese etc, reduce the hardness of the water to make all specifications of the water quality fully meet the state fresh water standard of fresh drink water.

Flat conveyor

·The bottle belt is synchronously tracked with the host or the upstream and downstream equipment, which are connected to control system.
·The bottle does not fall, does not jam, and does not block during the conveying process.
·According to the user's needs, the buffer platform can be set in front of the labeling machine (the buffering time is usually about 1-2 minutes).
Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including
Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including

Automatic labeling machine

1.Hot melt glue labeling machine is widely used for different material of container .
2.The label cost is comparatively lower, it can meet the requirements of those users who have diverse kinds of the containers.
3.It is the most economical models in cost to make mass production and intergrated operating.
4.The equipment has massively used modularization design concept to make it easy and simple for users to change the bottles.

PE film packaging machine

Automatic PE film heat shrink wrapping machine is suitable for wrapping of such products as pop top, mineral water , bottles. beer, drinks etc. Working with PE film shrink tunnel to pack the goods perfectly , the whole production process adopts the Germany advanced technics, and the main parts are imported from international famous companies. It consists of seven actuating motor, through cooperation with 7 actuating motor to form the product packed with plastic film and several bottles as a group out from the hot shrinking packing machine.

Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including

 

After Sales Service

To help our customers build an ideal factory. With efficient cost control, we have found the right balance with our customers: diversified production range, high-class packaging forms. Meanwhile market competitivness has been improved because of the efficient operation mode of equipments.


Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including

Nearly 15 years, King Machine has provided bottling & packing equipments of liquid solutions to companies all over the world, water bottling line, juice filling line, carbonated soft drinks turnkey project, oil and soda water bottling line and labeling and packing machinery. All your different requiremts King Machine can always offer you the most professional solutions and turnkey project.

Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including

 

Company Profile

King Machine Company indtroducton:

1. Installation, debug
After equipment reached the workshop of customer, place the equipment according to plane layout we offered. We will arrange seasoned technician for equipment installation, debug and test production at the same time make the equipment reach the rated producing capacity of the line. The buyer need to supply the round tickets and accommodation of our engineer, and the salary.
2. Training
Our company offer technology training to customer. The content of training is structure and maintenance of equipment, control and operation of equipment. Seasoned technician will guide and establish training outline. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures.
3. Quality guarantee
We promise that our goods are all new and not used. They're made of suitable material, adopt new design. The quality, specification and function all meet the demand of contract. We promise that the products of this line could storage for one year without adding any aseptic.
4. After sales
After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price. In quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician.
After quality guarantee, we offer technology support and after sales service. Offer wearing parts and other spare parts at favorable price; after quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems.
Complete New Project for Water Bottling Plant Machinery and Cost of The Project From a to Z with Costings and Maintenance Including

FAQ

 

Q1: Do you have reference project?
A1: We have reference project in most countries,If we get the permission of the customer who has brought the machines from us ,we can tell you their contact imformation,you can go to vist their factory.
And you are always welcome to come to visit our company,and see the machine running in our factory,we can pick you up from the station near our city.
Contact our sales people you can get video of our reference running machine
Q2: Do you have agent and after-service stations?
A2: So far we have agent in Yemen,Nigeria,Dubai,India,Kenya,Dubai welcome to join us!
Q3: Do you provide customized service
A3: We can design the machines according your requirements(materil ,power,filling type,the kinds of the bottles,and so on),at the same time we will give you our professional suggestion,as you know,we have been in this industry for many years.
Q4: What's your guarantee or the warranty of the quality if we buy your machines?
A4: We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Q5: How long time for installation?
A5: According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.



Please feel free to contact with me:
Zhangjiagang King Machine Co.,Ltd
Add: NO.22 East Seven Road Donglai Town, Zhangjiagang City, Jiangsu Province, China

keywords : bottled water machine, pure water sealing machine, water making machine, water packaging machine, plastic bottle making machine, purified water machine, table water machine, pure water machines, water machine price, pure water machines for sale, water sealing machine, purewater machine, water processing machine, water bottling plant for sale, bottle water production, water packing machine, price of pure water machine, water bottling machine prices, bottled water production machines


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier