Automatic High Efficient Pet Bottle Blowing Machine
Introduction:
Full-automatic PET bottle blow molding machine is the most stable two-step automatic stretch blow moulding machine.PET bottle blowing machine has two cavities to six cavities and the maximum volume of the products is 2000ml. the speed is 1000 bottles per hour per cavity (based on 500ml bottle). PET bottle machine can blow bottles in shapes: carbonated, mineral, pesticide, cosmetics, wide-mouth, hot filling, and other packing containers, which is made of plastic of crystalline type, such as PET and PP etc.
Adavantage:
1)Stable performance with advance PLC
2)Automatic preform conveyor to save human cost
3)Prefrom self-rotation and infrared pre-heater revolution assure the even distribution of heat ,which improve the bottle shaping rate,increase the production
4)High adjusting performance to enable preheat the preforms perfectly by adjust the voltage control area in the PLC ,Which could adjust the temperature of the infrared lights in the pre heater ,and keep the proper temperature and humidity invariable
5)High safeties with security automatic-locking device in each mechanical action ,which will make the production into a perfect safe enviroment ,in case of the bearkdown in certain prodcedure .
6). Introduce the FESTO air cylinder to avoid contamination and noise.
7). Satisfaction with different atmospheric pressure for blowing and mechanical action by dividing the blowing and action into three parts in the air pressure diagram of the machine.
8). Strong clamping force with high pressure and double crank links to lock the mould.
9). Two ways of operating: automatic and manual.
10). Low cost,high efficiency,easy operation and maintenance etc, profited from the fully automatic technological process.
11). Ideal cooling system make the finished bottles without any flaws.
Technical parameters:
Model |
Item |
KM-A2 |
KM-A4 |
KM-A6 |
Productivity |
|
1800-2000pcs |
3200-4000pcs |
5000-550pcs |
Product type |
Volume |
0.1-2L |
0.1-2L |
0.1-2L |
Body diameter |
<100mm |
<100mm |
<100mm |
Height |
<310mm |
<310mm |
<310mm |
Neck diameter |
28-30mm |
28-30mm |
28-30mm |
Mould |
Cavity |
2 |
4 |
6 |
Mold thickness |
240mm |
240mm |
240mm |
Mold volume |
260*240*370mm |
510*240*370mm |
640*240*360mm |
Main machine power |
Electrical source power |
By customer order |
Rated power |
25kw |
49kw |
73kw |
Really use power |
6.5kw |
13kw |
25kw |
Air system |
HP air compressor |
2.4/30kg |
3.2/30kg |
6.4/30kg |
LP air compressor |
1.0/30kg |
1.6/30kg |
2.0/30kg |
Air tank |
0.6/30kg |
0.6/30kg |
1.0/30kg |
Air dryer |
2.0/30kg |
2.0/30kg |
6.0/30kg |
Cooling water |
3hp |
3hp |
5hp |
Machine |
Size |
1900*1280*1930mm |
2300*1800*1930mm |
4300*2000*1930mm |
Weight |
2000kg |
3600kg |
4800kg |
Preform unscrambler |
Size |
2000*950*2480mm |
2000*950*2480mm |
2000*950*2480mm |
Weight |
250kg |
250kg |
250kg |
King Machine Company indtroducton:
1. Installation, debug
After equipment reached the workshop of customer, place the equipment according to plane layout we offered. We will arrange seasoned technician for equipment installation, debug and test production at the same time make the equipment reach the rated producing capacity of the line. The buyer need to supply the round tickets and accommodation of our engineer, and the salary.
2. Training
Our company offer technology training to customer. The content of training is structure and maintenance of equipment, control and operation of equipment. Seasoned technician will guide and establish training outline. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures.
3. Quality guarantee
We promise that our goods are all new and not used. They're made of suitable material, adopt new design. The quality, specification and function all meet the demand of contract. We promise that the products of this line could storage for one year without adding any aseptic.
4. After sales
After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price. In quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician.
After quality guarantee, we offer technology support and after sales service. Offer wearing parts and other spare parts at favorable price; after quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems.
FAQ
Q1: Do you have reference project?
A1: We have reference project in most countries,If we get the permission of the customer who has brought the machines from us ,we can tell you their contact imformation,you can go to vist their factory.
And you are always welcome to come to visit our company,and see the machine running in our factory,we can pick you up from the station near our city.
Contact our sales people you can get video of our reference running machine
Q2: Do you have agent and after-service stations?
A2: So far we have agent in Yemen,Nigeria,Dubai,India,Kenya,Dubai welcome to join us!
Q3: Do you provide customized service
A3: We can design the machines according your requirements(materil ,power,filling type,the kinds of the bottles,and so on),at the same time we will give you our professional suggestion,as you know,we have been in this industry for many years.
Q4: What's your guarantee or the warranty of the quality if we buy your machines?
A4: We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Q5: How long time for installation?
A5: According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.